Amirkhanian, S N, Burati, J L and Mirchandani, H C (1994) Effect of Testing Variability on Contractor Payment for Asphalt Pavements. Journal of Construction Engineering and Management, 120(03), 579–92.

Cohenca‐Zall, D, Laufer, A, Shapira, A and Howell, G A (1994) Process of Planning during Construction. Journal of Construction Engineering and Management, 120(03), 561–78.

El‐Itr, Z and Kangari, R (1994) Minority Contractors: Framework for New Policy Development. Journal of Construction Engineering and Management, 120(03), 632–48.

Everett, J G and Farghal, S (1994) Learning Curve Predictors for Construction Field Operations. Journal of Construction Engineering and Management, 120(03), 603–16.

Gavilan, R M and Bernold, L E (1994) Source Evaluation of Solid Waste in Building Construction. Journal of Construction Engineering and Management, 120(03), 536–52.

Gugel, J G and Russell, J S (1994) Model for Constructability Approach Selection. Journal of Construction Engineering and Management, 120(03), 509–21.

Jergeas, G F and Hartman, F T (1994) Contractors' Construction‐Claims Avoidance. Journal of Construction Engineering and Management, 120(03), 553–60.

  • Type: Journal Article
  • Keywords: Construction management; Claims; Contracts; Contract management; Information management; Risk management;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)0733-9364(1994)120:3(553)
  • Abstract:
    The number of construction claims has been increasing and has become a time‐consuming and costly element in construction projects in North America. The probability of a claim arising at some point in time is a fact of life on most construction projects. In recent years, contractors have become increasingly concerned with claims, their associated costs, and the poor recovery of actual costs associated with their settlements. Therefore it is in the interest of every contractor to familiarize himself with the means to avoid claims or to be ready to mitigate the consequential damage therefrom. The purpose of this article is to minimize both contractors' and owners' chances of becoming involved in construction claims and disputes. It will emphasize the need to have proper knowledge of the contract and good record keeping, which is essential for the contractor to maintain control over the project and mitigate potential claims. The article includes a list of major causes of construction claims and presents a general claim protection guideline.

Laborde, M and Sanvido, V (1994) Introducing New Process Technologies into Construction Companies. Journal of Construction Engineering and Management, 120(03), 488–508.

Mahoney, J J and Tatum, C B (1994) Construction Site Applications of CAD. Journal of Construction Engineering and Management, 120(03), 617–31.

Reyna, S M, Vanegas, J A and Khan, A H (1994) Construction Technologies for Sewer Rehabilitation. Journal of Construction Engineering and Management, 120(03), 467–87.

Suhail, S A and Neale, R H (1994) CPM/LOB: New Methodology to Integrate CPM and Line of Balance. Journal of Construction Engineering and Management, 120(03), 667–84.

Swiggum, K E, Anderson, S D and Russell, J S (1994) Case Study of Burlington Cable‐Stayed Bridge. Journal of Construction Engineering and Management, 120(03), 649–66.

Tsimberdonis, A I and Murphree, E L (1994) Equipment Management through Operational Failure Costs. Journal of Construction Engineering and Management, 120(03), 522–35.

Woolery, J C (1994) Developing Specifications for Cellular‐Telephone Base Stations. Journal of Construction Engineering and Management, 120(03), 593–602.